-- card: 21255 from stack: in -- bmap block id: 0 -- flags: 0000 -- background id: 3633 -- name: Arrange to Timeline -- part 28 (field) -- low flags: 01 -- high flags: 0000 -- rect: left=11 top=56 right=71 bottom=233 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 0 -- font id: 3 -- text size: 10 -- style flags: 256 -- line height: 13 -- part name: subhead -- part 29 (field) -- low flags: 01 -- high flags: 0000 -- rect: left=241 top=56 right=71 bottom=463 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 0 -- font id: 3 -- text size: 10 -- style flags: 256 -- line height: 13 -- part name: subhead -- part contents for background part 6 ----- text ----- Automatically positions boxes in the Schedule Chart so that the space between boxes represents the time interval between the Earliest Start date of tasks. Often, this command gives you a chart that is easier to read. If you prefer the original version, however, you can undo the results of Arrange to Timeline by choosing Undo Arrange from the Edit menu before doing anything else. -- part contents for background part 7 ----- text ----- Changes the selected task box, annotation, or picture in the Schedule Chart to a legend. A task box linked to any other task or milestone cannot be changed into a legend. The legend keeps the same appearance as the original object, but the names of the attributes currently displayed in the chart appear at its corners. You cannot edit text in a legend. If you paste a legend into another chart, only the picture is pasted, not the attribute information. The attribute information is updated when you set attributes for the project. -- part contents for card part 28 ----- text ----- Arrange to Timeline -- part contents for card part 29 ----- text ----- Change to Legend -- part contents for background part 28 ----- text ----- Arrange to Timeline & Change to Legend -- part contents for background part 27 ----- text ----- The Layout Menu